Showing posts with label Chetsi. Show all posts
Showing posts with label Chetsi. Show all posts
Monday, July 19, 2010
Frac Orphans
Today we arrived for our 6:15 yard time and were orphaned by the Yellow crew due to a lack of space in the van. Anjelica and I weren't sure what to do with ourselves and Andrew of the Red crew adopted us (so we got to hang with Nick). We didn't leave until approximately 9 am so I took a good 2 hour nap on a desk in the break room. Both crews were rigging up today and both crews had some issues getting the equipment transfered from sight to sight so it was a sort of slow day. We helped change out valves in the fluid ends of the pumps and general setting up of the site. It was nice that we weren't covered in sand but it made for a lot of sitting around. The good thing was everyone was sitting waiting for equipment to arrive so we didn't look like too much extra dead weight. It was another crazy hot day and again I succeeded in hydrating adequately and not having to pee at the sight. Win for me! I also acquired a couple new nicknames from Cody (a frac'er): Toto (you have no idea how many Dorthy/Kansas jokes I've endured...I've lost count) and Sam-I-Am. They pair up nicely with Jay's "Red." All in all, it wasn't a terrible day. I'm still counting down the days until frac is over though. Sorry Chetsi.
Sunday, July 18, 2010
Gahhh Frac
So far Frac is my least favorite. The days are crazy long and as an intern who isn't qualified to do anything we just stand around and watch people do things...when they do them. Sometimes we stare at eachother doing nothing. It was also approximately as hot as the surface of the sun.
We had a 5am yard time this morning meaning we arrived on the job sight around 6:30 or so. Anjelica and I were then assigned to follow our new friend Chetsi (a new hire who lives in an apartment upstairs from us). She's a super green hat also so none of us are really qualified to do much. This is where a lot of the standing around originated I think. That and we were there for 14 hours and you can't possibly be busy for 14 hours straight. As far as I'm aware we completed about four stages on the two wells at the site. It could have been five because I wasn't sure exactly what was going on when we arrived that morning. When we got there they were fixing the POD (truck that mixes the sand and water for the job). At the end of the day they were having problems with the PCM (precision continuous mixer). In between there we frac'ed four or five segments of the wells and wireline guys set plugs between them. That was the day in a nutshell.
I learned a little more about the plug and frac interaction, the set up of the job (where the PCM and the acid trucks get into the sequence etc...), and the general atmosphere of a frac job. I also operated a shovel and was allowed to carry empty buckets back to the chem transport truck. I also learned that when everyone disappears they have gone to the tractor cabs to cool off and we were allowed to do the same. And we did. A lot. I also reaffirmed my ability to fall asleep sitting up and or standing propped against a truck. I didn't mean to but you can only watch sand fly into a slinger from a sand cheif for so long before your brain shuts down and your eyes and body follow suite. Woops.
Overall the day was kind of miserable. There is sand EVERYWHERE... all over everything and all over you. I can't imagine that anyone working as a frac'er would ever agree to go to the beach. It would be too much like work. On the plus side I drank just enough fluids to keep properly hydrated but I never had to use a port-o-potty (yea I sweat that much). Thank the Lord in heaven for that. I hate those things.
Tomorrow's yard time is 6:15 so that will be a bit better but I imagine that just means we'll be back a bit later. I hope not but I'm assuming the worst. We'll spend the day rigging up because we were just finishing the job when we left (it had started on Tuesday of last week and each well needed 13 stages which takes...well until Sunday night) and it is being rigged down tonight as I type this up. It's going to be a long day tomorrow and a long week. I'll try to remain faithful to you dear readers (Mom, Scarlett, and...well you may be it) and post nightly but I make no promises. If you don't hear from me, know that I am probably fine just really sweaty and sandy.
Friday, June 25, 2010
It's Friday! Oh wait, I work all weekend so it doesn't matter...
We spent our whole day doing standards certification. It wasn't as fun as it sounds. The good news is we are starting real work tomorrow. Anjelica and I start in the lab and Nick's in the bulk plant. Early next week we'll switch and then at the end of the week we'll hopefully be out on jobs!
In other news, I got my oil changed. Sorry I was so late doing it, Dad. My bad.
Oh we also met one of the new engineers today. Her name is Chetsi (sounds like Chelsea but with a t instead of an l). She lives upstairs from us and she's nice. She helped us find Chick-fil-A for lunch so we like her. :)
Tonight I think our plan is to go hang out with the other engineers for Chris's (cement engineer) birthday. I'll let you know how that goes.
Subscribe to:
Posts (Atom)